Geomembrane requirements
Process flow
Zhoutou Reservoir dam composite geomembrane anti-seepage adopts the section cycle operation of digging, laying, ramming and protecting.
Base surface cleaning
The base surface must be cleaned according to the design requirements, which is the key to ensure the anti-seepage effect, especially the debris such as sharp stones and tree roots should be completely removed. Use a tamper or tamper to tamp it tightly to make it compact and level.
composite laying
When laying the film, it must be laid from bottom to top. The film and the film and between the film and the base surface should be pressed flat and tightly, but the film should not be pulled too tightly. Generally, it should be slightly loose, but there should be no air bubbles at the bottom of the film. Because the geomembrane is relatively thin and light, it is very easy to be blown by the wind before the protective layer is laid after laying, so the area of one laying membrane should not be large, and it is best to cover the protective layer with soil material while laying the membrane.
According to the information provided by the manufacturer, the width of the composite geomembrane is 1.0~1.9m, and the width of 1.9m is selected for this project to reduce the material used for the joint. The joints are hot-bonded, glued, lap joint and other methods. The design of this project adopts glue, and the joint width is 50mm.
If a puncture or tear of the geomembrane is found, it must be repaired with a geomembrane adhesive three times the size of the damaged area.
protective face
The 10cm-thick protective layer soil material by the geomembrane must be sieved, and no particles larger than 6mm in size are allowed, otherwise the geomembrane will be easily pierced. The soil material of the protective layer must be compacted by tamping to ensure that the dry bulk density is above 1.5, and sampling inspection shall be conducted at any time. When backfilling the protective layer and building block stone protective surface, it must be handled lightly to avoid breaking the geomembrane. Under the block stone protective surface, a 100mm thick gravel or gravel cushion should be laid to prevent the soil protection layer from being washed away due to the influence of water level changes, wind and waves and other factors. Dry masonry blocks shall be paved with artificial hanging lines, the blocks shall be tightly embedded, the individual weight of the surface blocks shall be greater than 48kg, and all gaps shall be filled with small blocks.
Peripheral processing
The requirement of peripheral junction treatment is to tightly connect the composite geomembrane with the surrounding soil, block the seepage inlet, cut off the lateral leakage path, prevent seepage water from entering the bottom surface of the geomembrane, form blisters, and burst the geomembrane when the reservoir water level drops. . Therefore, the perimeter junction must dig a water interception groove and bury the geomembrane in the groove .
Previous Page
Previous Page
RELATED NEWS
Construction process of geotextile
1. The old pavement should be cleaned of dust, loose particles and sundries, and the surface should be kept dry. The sharp and abrupt parts of the road surface shall be leveled; for the seriously damaged and broken parts of the road surface, the broken parts shall be removed and repaired with asphalt concrete. For the pavement with serious cracks or ruts, a layer of 1-2cm leveling layer should be filled.
2022
10-25
Precautions for construction of geogrid
The paving surface of the geogrid should be relatively flat. After the paving layer has passed the acceptance, in order to prevent the longitudinal skew phenomenon, first draw a white line or hanging line on the paving layer according to the width, and then start the paving, and then use iron Fix the end of the grille with nails (8 nails per meter width, fixed at an even distance), after fixing the end of the grille, use a paving machine to slowly pull the grille forward, and carry out manual labor for every 10 meters long. Tighten and straighten once until one roll of grille is finished, and then lay the next roll. The operation is the same as before. After laying one roll, use a 6T-10T road roller to roll it from the starting point to the forward direction.
2022
10-25
The role of geogrid engineering
It has high strength, low creep, and can adapt to various environmental soils, which can fully meet the use of tall retaining walls in high-grade highways. It can effectively improve the interlocking and occlusal effect of the reinforced bearing surface, greatly enhance the bearing capacity of the foundation, effectively restrain the lateral displacement of the soil, and enhance the stability of the foundation.
2022
10-25
Scope of application of plastic blind ditch
1) Reinforcement and drainage of road and railway subgrade shoulders; 2) Drainage of tunnels, subway underground passages, and underground freight yards; 3) Soil and water conservation for hillside and side slope development;
2022
10-25
Product characteristics of flexible permeable pipes
1. The material of the soft permeable pipe 1) High carbon steel wire: phosphoric acid anti-rust treatment, PVC coating to prevent acid and alkali corrosion, unique steel wire spiral skeleton to ensure the smooth surface of the pipe wall and withstand pressure. 2) Non-woven filter layer: ensure effective filtration and prevent sediment from entering the tube. 3) Synthetic polyester fiber: The warp yarn is made of high-strength T-DOLON yarn or nylon yarn covered with PVC, and the weft yarn is made of special fiber, which has sufficient tensile strength.
2022
10-25
Transport mode of HDPE double wall corrugated pipe
HDPE double wall corrugated pipe can be transported by various vehicles. During transportation, loading and unloading, it is not allowed to throw, hit, press, expose for a long time or get close to heat sources. Mixed transport with toxic and hazardous substances is not allowed. The perforated tube in the form of a disc cannot be transported flat.
2022
10-25