Geogrid construction and laying method

Anchorage method: Fiberglass geogrid without self-adhesive enhances asphalt concrete pavement and prevents reflection cracks between pavement and pavement. Anchorage method can be used for construction, but it is advisable to lay fiberglass geogrid first, and then sprinkle hot asphalt for bonding. Oil, construction personnel must wear gloves, construction methods are as follows:
The sticky layer oil should be AH-70 or AH-90 heavy oil hot asphalt. The specification and quality of the sticky layer oil should conform to "Technical Specification for Highway Asphalt Pavement Construction" JTJ032-94, and it should be sprayed by special vehicles. The amount of sticky oil per square meter is about 0.4kg-0.6kg.
When laying fiberglass geogrids, the laying should be kept smooth and taut. The horizontal lap length should be 50-100mm, and the vertical lap length should be 150-200mm. According to the paving direction, press the rear end to the front end. Down.
Rolled with rubber rollers.
50?0?.3mm fixed iron sheet, it is required to be flat and not warped, the periphery should be chamfered, 2-inch steel nails (high-quality cement nails)
When laying fiberglass geogrid by nail fixing method, first fix one end with fixed iron sheet and nails on the lower structure that has been sprinkled with adhesive layer asphalt, and the nails can be injected by hammering or shooting gun. When the grid is tensioned longitudinally, the glass fiber is in a straight tension state in the transverse direction.
When the nails are fixed, the overlapping distance of the grille shall be as follows: the overlapping distance of the longitudinal joint shall not be less than 15cm, and the overlapping distance of the horizontal joint shall not be less than 5cm. Longitudinal laps shall place the former on top of the latter according to the direction of asphalt paving.
When fixing, the nails cannot be nailed to the glass fiber, and the glass fiber cannot be directly hit with a hammer. If the nail is broken or the iron sheet is loose after fixation, it needs to be re-fixed.
To prevent the tires of construction vehicles from sticking to the fiberglass grille and sticky oil. In case of slippage of the wheel of the asphalt paver, stone chips should be sprinkled on the surface of the sticky layer oil, and the amount of stone chips should be 3m3/1000m2-5m3/1000m2.
Construction shall not be carried out when the atmospheric temperature is lower than 10 degrees Celsius or the road surface is wet.
The construction method of the asphalt surface layer is the same as that of the ordinary asphalt pavement surface layer, but it should be noted that the construction vehicle shall not make sharp turns or brake suddenly on the surface of the fiberglass grid. ⑵ Self-adhesive fiberglass geogrid direct laying method
Self-adhesive fiberglass geogrid: convenient construction method and stable quality. The construction method is as follows:
For old asphalt concrete pavement and old cement concrete pavement, make a leveling layer with a thickness of 20mm-30mm, and use a vacuum truck or sprinkler to ensure that the road surface is clean.
Spray AH-70 or AH-90 heavy oil hot asphalt, the dosage should be 0.3kg-0.4kg/m2.
Use the special paver provided by our group to lay the self-adhesive fiberglass grating. The laying should be smooth and tight.
The horizontal lap length should be 50mm-100mm, the longitudinal lap length should be 150mm-200mm, and the overlapping direction of the lap should be consistent with the running direction of the asphalt concrete paver.
Use a rubber wheel roller for rolling (a rubber wheel roller needs to be equipped with a sprinkler).

RELATED NEWS

Construction process of geotextile

1. The old pavement should be cleaned of dust, loose particles and sundries, and the surface should be kept dry. The sharp and abrupt parts of the road surface shall be leveled; for the seriously damaged and broken parts of the road surface, the broken parts shall be removed and repaired with asphalt concrete. For the pavement with serious cracks or ruts, a layer of 1-2cm leveling layer should be filled.

2022

10-25

Precautions for construction of geogrid

The paving surface of the geogrid should be relatively flat. After the paving layer has passed the acceptance, in order to prevent the longitudinal skew phenomenon, first draw a white line or hanging line on the paving layer according to the width, and then start the paving, and then use iron Fix the end of the grille with nails (8 nails per meter width, fixed at an even distance), after fixing the end of the grille, use a paving machine to slowly pull the grille forward, and carry out manual labor for every 10 meters long. Tighten and straighten once until one roll of grille is finished, and then lay the next roll. The operation is the same as before. After laying one roll, use a 6T-10T road roller to roll it from the starting point to the forward direction.

2022

10-25

The role of geogrid engineering

It has high strength, low creep, and can adapt to various environmental soils, which can fully meet the use of tall retaining walls in high-grade highways. It can effectively improve the interlocking and occlusal effect of the reinforced bearing surface, greatly enhance the bearing capacity of the foundation, effectively restrain the lateral displacement of the soil, and enhance the stability of the foundation.

2022

10-25

Scope of application of plastic blind ditch

1) Reinforcement and drainage of road and railway subgrade shoulders; 2) Drainage of tunnels, subway underground passages, and underground freight yards; 3) Soil and water conservation for hillside and side slope development;

2022

10-25

Product characteristics of flexible permeable pipes

1. The material of the soft permeable pipe 1) High carbon steel wire: phosphoric acid anti-rust treatment, PVC coating to prevent acid and alkali corrosion, unique steel wire spiral skeleton to ensure the smooth surface of the pipe wall and withstand pressure. 2) Non-woven filter layer: ensure effective filtration and prevent sediment from entering the tube. 3) Synthetic polyester fiber: The warp yarn is made of high-strength T-DOLON yarn or nylon yarn covered with PVC, and the weft yarn is made of special fiber, which has sufficient tensile strength.

2022

10-25

Transport mode of HDPE double wall corrugated pipe

HDPE double wall corrugated pipe can be transported by various vehicles. During transportation, loading and unloading, it is not allowed to throw, hit, press, expose for a long time or get close to heat sources. Mixed transport with toxic and hazardous substances is not allowed. The perforated tube in the form of a disc cannot be transported flat.

2022

10-25

< 12 >

ONLINE MESSAGE

Submit Message